It's not hard to understand.

The higher.

The more people you can plug in, the more area you can sell. You know, the land in loy is actually about the same as no money.

Around.

There are not many people, even if there are, spread out equally on the whole project, almost can be ignored. In this case, of course, the higher it is, the higher it is.

"Very high?" Mihao asked again.

"No."

Shake your head opposite.

"The Indian side wanted to, but was rejected by the Bank of Maine group. In fact, most of the buildings were raised by less than 20%, still low."

"But."

"But another kind of compromise has been formed, that is, in some places, greater concessions have been made, for example, there are many large and dense communities, which are good for blocking people."

"So."

"It's a compromise."

I'm done.

Mihao nodded.

Yes.

The projects done by Bank of Myanmar group have always been highly demanding and principled, and they would rather not do them than make a pile of disliked ones.

One should look good.

One needs to be sold more.

OK.

Then I will plan some large communities for you. Other places are still the original standards. In this way, it will not damage the overall beauty of loy city.

And.

Even these high-rise buildings, with the "high standard of aesthetics" of the Bank of Myanmar group, should make up for their shortcomings with excellent design.

Yeah.

OK.

The rest is the work.

With such a party A, or Party A's representative, MI Hao is very comfortable. He is afraid that Party A will grind everything.

I also like to change three times a day.

It's not like now.

It's only over half a month.

-Financing.

-Planning.

-Design.

-Plot.

-Bidding.

So it's finished. It's not only fast, but also it's not asking for financing from others. Just sit at home and open the door, someone will give money.

That's it.

How many developers want to cry in the toilet, envy want to hit the wall.

"By the way."

"How long will it take to start."

"61."

"Ah?"

"61."

Mi Hao: "..."

61.

What's the date today? On May 25, it means that there are only six days, six days, to pass the examination of the relevant construction departments in India.

Obtain all kinds of licenses.

Boss.

You're not kidding?

At first.

Even the city loans in India have a lot of preparation time. When they enter the construction site, they are more than half a month away from the bidding time.

Now.

The amount of work has doubled many times, but the time is less.

Now.

Just listen to the opposite way:

"ha ha, don't be surprised. There is a lot of capital involved this time. It's no surprise that they are able to do a lot of things together. "

"Yes."

Mi Hao nods.

After another chat, I hung up.

Here.

You don't have to go to Africa.

OK.

In addition, there are many bonuses for such a large project. For the previous project, the bonus is more than one year's salary.

This time.

The contract has nearly fivefold.

Finish.

As a project manager, I can get more than one million bonus at least.

Beautiful and Zizi.

。。。

The next day.

The headquarters had the drawings sent.

“。。。”

Generally, there are at least ten drawings for a house, from the architectural planning to the most detailed material list, one block of drawings, directly on tons.

And now.

Sixteen blocks.

All right.

The archives are almost full. Looking at it makes people dizzy. Mi Hao's mouth is drawn. He really doubts that this is what a person can do?

How long.

It's still 16 blocks. How big is the whole city of loy? Needless to say, it's very big. It's just a drawing. It needs more than ten vans to pull it.

Such a design task, in a limited time, is more difficult than hell. However, it doesn't matter who designs and how.

It's important to build.

"Whoo!"

Take a deep breath and take a master plan.

Meeting."We can see that this project is distributed in four directions: East, South, West and North. Some of them are connected, so there are six connected areas in total."

"One project department for each area."

"This time."

"Due to the huge amount of work, the company will send three more deputy managers. According to the plan, the construction will start on June 1, and relevant supporting facilities will arrive in these days. "

“。。。”

He'll be good again.

Not so many areas.

So.

Two more people were added to him. After all, every block is full of hundreds of buildings. It's like a hill on the drawing. It's too far back and forth.

"These days."

"You should be familiar with the drawings and work out the construction plan. Once the construction is started, the progress is not waiting for people. Although the work volume is large this time, I believe you have experience."

"Anyway."

"Process, procedure, must be planned reasonably."

"Equipment, personnel and head office will assist in allocation. The project is large and the demand for materials is large. Langyu county has allocated a piece of land in the south. "

"Material transfer dedicated to this project."

“。。。”

Two hours later.

At the end of the meeting, MI Hao also had no way. There were too many things to do. This was the way to do the project, no matter in the early, middle and late stages.

Fortunately.

Tired and tired, not afraid to default.

Otherwise,

if you work hard for a year and can't get money, you will be upset.

。。。

After the meeting.

Get in the car.

Come to the border between India and Myanmar.

Now.

It's almost the same as when he first came here. I saw a large number of engineering vehicles queuing up. Those who had finished their work before had to go back. They are busy there now.

61. Construction time.

What do you mean?

It means that we can build a house. Before we build a house, we have another task: three supplies and one leveling, water supply, electricity supply and access road.

And site leveling.

Otherwise.

He will not be surprised to start construction on June 1st. After getting the land, the three links and one leveling can make their own, but building a house requires various certificates.

Review drawings.

Review of information.

The picture of more than a dozen trucks, even if the construction and other departments of this state of India together, all the staff out, Mihao estimates, a month is enough, but now only a few days.

The first reaction is: can I give up?

After passing the card.

There are only some places where the dust is flying. That is to level the land. The land here is relatively flat, but it is much simpler. As for the tee joint.

It's also simple.

Dig a hole.

Buried pipe.

In one go.

If water is used, electricity in loy city is also used. There are mature supporting facilities. There are two power plants, one for the main and one for the standby. Now the two power plants are not large enough to operate together.

It's totally satisfying.

And.

The hydropower pipeline is not running around the whole area, but around it to supply the main construction demand of electricity and water.

Such as concrete mixing.

It is directly located at the edge of the city. At the beginning of construction, the power consumption of each block is very small, mostly various kinds of mechanical oil.

Excavator.

Crane, etc.

As for the project department, there is solar energy.

According to the large process, when they dig the pit, the construction of underground works such as pipes and canals will take the lead. Therefore, in the stage of a large amount of electricity, there will be electricity.