The next two days.

Under the leadership of Dong Shi.

At an extremely fast speed, they completed the other three desert surveys. They wanted to slow down, but their work efficiency was too high. After one place has been tested, go to the next place immediately.

Fortunately.

When you get to a place, you just need to wait in place. You don't need to run around or be tired.

14.

A circle.

They went back to the original desert again. According to He Gong, today's equipment team will arrive. After breakfast, they rush here to find a relatively flat place.

A quarter past ten.

Dong Shi sees a motorcade.

He is dragging long smoke and dust to come here. It seems that he is a big guy. In a moment, the motorcade is lined up in front of them. Dong Shi simply counts, which is enough for 15.

After stopping.

A man in overalls came up from a car.

Hand him a document.

"H342 delivery task, please sign for it."

"Well."

He Gong takes over the documents.

It's a bit superfluous to check the box numbers one by one at the beginning, but the process still needs to go. Dong Shi follows and looks at the things pulled by this line of motorcade in bewilderment.

Container.

Container.

Or containers.

The last two things are not containers. They are also wrapped in tarpaulins. They can't be seen clearly. But it's certain that these two big guys are bigger than containers in terms of body size.

Finish reading.

Signature of Ho Gong.

"According to the figure, uninstall it."

"Good."

Next.

Dong Shi saw these cars unload the containers, forming a regular circle... Square? In the middle of the square, there are two containers, which makes Dong Shi confused.

What is this to do?

Look at them.

Dong Shi opened his mouth and finally closed it.

Can't ask.

Can't ask.

If you ask, it seems that you haven't seen the world.

But.

Ten minutes later.

Dong Shi grows up unconsciously.

Only see.

At each corner of the rectangle, the outer shell of the container was removed, revealing the inside shape. It was a square black matte surface cube, and then he understood what it was.

A square roll.

With the help of the winch.

The whole "coiled material" spreads vertically in two directions and soon stretches nearly 20 meters. The containers with four corners directly enclose a square area of nearly one mu.

The containers in the middle are also these plates.

After spreading out.

Mechanical connection.

Hydraulic leveling.

It's completely flat.

“。。。”

Just when dong thought it was over.

An installer came to the edge of the flat.

"Wow."

A pull of the hand.

A long transparent board was pulled out from the inside. It was two meters long. Then, it was lifted hard. The board was perpendicular to the ground. Only a click was heard. After the man released it, he did not fall down.

Stand straight there.

Next.

"Wow."

"Click."

One by one, the transparent plates were pulled out.

Not long.

The whole platform is surrounded by transparent baffles more than two meters high, each of which is printed with the logo of Myanmar Asia Environmental Protection Technology Co., Ltd. except for the wall, there are four doors on four sides.

Dong Shi pushes it up and finds that it's very firm. Only with all his strength can he push it slightly.

There is no hollow feeling on the platform floor.

There was no squeaking.

"He Gong, what is this?"

"G3-4 workstation, our company's customized products." He Gong, whose full name is he Benshan and Chinese, originally worked in Huaxia branch of Myanmar Asia environmental protection company, was recently transferred to the "oasis" project.

The truth.

It was also the first time he had seen it.

"Custom? Not made by your company? " Dong Shi was surprised.

"No."

Then.

Other containers open.

Start to assemble the reserved holes on the ground, fix one alloy upright rod, and fasten one piece of baffle plate from the top to form a wall and a roof, some of which are still two layers.

A functional house is modular.

Dormitory.

Canteen.

Conference room.

Warehouse.

。。。

Tables and chairs.

Computers.

Television.

Air conditioning.

Everything.

It was just noon.

Almost formed a functional living area.

Clean.

Clean and tidy.

Dong Shi thought before that they would build some color steel plank houses like the construction site. After all, this is the Gobi. The other side didn't say that they would build houses. Unexpectedly, they brought their own mobile work area.

I'm good.

It's only half a day.

A perfect area that can hold about 20 people's life has emerged.

4 p.m.

Electricity.

Water.

It's all through.

Cable, lighting, monitoring, shower and other equipment are also installed.

In the evening.

Look around the bright area.

Dong Shi didn't know what to say. In one day, a complete camp was built, which was comparable to the speed of military industry. He wanted to go back to his home in the city, but suddenly he was ready to stay for a night.

At night.

Lie in the dormitory.

In the desert of hot dogs in the daytime, it has been reduced to about zero at night. Watching the high-definition TV on the wall and blowing the air conditioner, Dong Shi soon fell asleep.

The next day.

Wake up.

Dong Shi heard the roar of the machine, and went out. Through the transparent wall, he saw that two huge equipment had been operated on it. The long pipe was filling the tank car.

Not far from the door.

Two uniformed police officers were on duty. In the next three years, the major project was still in the wilderness. Four police officers were specially assigned to take charge of their safety in the city.

Not all the time.

Every three months.

"They are so early?"

"It's called dedication."

"It smells good. I can smell the onion pancake."

"Go, have breakfast first."

After breakfast.

Dong Shi saw the sprinkler start to move.

He walked over.

"What's going on?"

"Yes, just filled up the 'oasis' solution, ready to start spraying." He Ben is a good man. As soon as it's dawn, they get up busy. For an hour, they finally make a pool.

Enough for five uses.

At the beginning.

He Benshan once wondered why the company didn't use pipe sprinkler technology to spread pipes and sprinklers on this land. Like irrigating farmland, it can directly pressurize, save time and effort.

Then think about it.

It's better to spray the car.

Not far.

It's only 500 meters from the mixing tank.

The sprinkler truck was opened, with wings like spray arms on both sides. Unexpectedly, it was fully 30 meters wide, about 60 meters wide. There were sprinklers on it.

Not too long.

The single arm of concrete pump truck can stretch fifty or sixty meters, which is only half of it.

"Are two enough?"

"Just as it happens, our spraying cycle is one month. According to the speed of two sets, one cycle per month, the automation and intelligence of these equipment are very high. They work continuously for one month and only need to be overhauled for one day."

"Ah? Continuous work? 24 hours? " Dong Shi was shocked.

"Or it won't be finished."

"Don't people rest?"

"Shift. Only three technicians are required to be on duty every day, mainly focusing on the screen, planning the route, etc. There is also necessary equipment operation monitoring, assisted by our remote technology team. "

"Can the car stand it?"

"Designed to operate stably for three consecutive months."

“。。。”

Yes.

You cow.

Automation is the trend, he knows, but what are you? It reminds him of the big data of Myanmar Asia Pharmaceutical Group. The on-site doctors are very relaxed, with big data and expert team support behind them.

It's a company that claims to be among the top three 500 companies in the world.

Sure enough, there are some brushes.