The radius is one hundred and eight meters.

It doesn't sound too big, but it's amazing when you calculate the volume.

---More than 5.2 million cubic meters.

What concept?

If filled with water.

It can hold more than five million tons.

The ore with a higher packing density will start at 10 million tons, which will greatly promote many things, and the efficiency is revolutionary.

Such as cement.

Such as steel.

Such as asphalt.



The one-time transportation volume is equal to the sum of the transportation capacity of all the freight ships built before. The fastest transportation speed is equivalent to teleportation, but it does not cost money.

Solve many problems at once.

Binding building teleportation, 10,000 cubic meters, the same as grabbing.

Distressed!

Well now, let's do it ourselves and save money.

Happy!

. . .

Calm down.

Came to the valley again.

I didn't eat those swamp silt anymore, because I couldn't digest it. In the future, I can only grow slowly. Consuming some waste products every day is almost enough.

Forehead!

It feels like I have become a junkie.

Fine!

It's good to eat anything, it's the same anyway, the source of eating is material, not picky eaters.

Come to the river.

After a few seconds.

A large area of ​​the river bed disappeared, and the rushing river water poured in. Shu Fu didn't stop, walking on the river bed, constantly collecting river sand, which was a good thing.

Control water.

sieve.

It is the best concrete raw material.

In the future, this will be the bottom of the reservoir.

It's useless to keep river sand, just dig it out to build a dam, so as not to waste it.

It's just that this picture always has a taste of "burning under the cauldron", but whatever it is, after a while, the entire valley and river basin widen a lot.

at the same time.

The source is also filled for the most part.

I didn't reinstall it.

Because there are only so many river sands that meet the requirements, and the other mud content is high, the collected just now does not need to be washed, and can be used after simple treatment.

subsequently.

Shu Fu came to various battlefields through the cabin.

There is no way, there are too many, and one cannot be handled.

ran around.

This is empty.

Preliminary calculations show that the river sand is almost enough to repair the hydropower station.

. . .

After collecting the river sand, Shu Fu came to the downstream, the valley's exit was more than one kilometer wide, which was different from the way some dams drilled and diverted water for repair.

wide enough.

Left and right segmented construction.

So Shu Fu came to a place one mile downstream from the dam site.

absorb!

freed!



repeatedly.

Use the excavated soil to fill in the middle and pile up the slope protection.

half an hour later.

A regular new channel appeared, with a depth and width similar to the main channel.

Wow~

When the soil in contact with the main stream is absorbed, the torrential river flows in along the new channel.

As for the original river?

already blocked.

Hundreds of thousands of tons of soil were smashed down at once, and it had to take a new path.

next.

Shu Fu intends to do the construction of the dam himself, which can be regarded as accumulating experience, but he can't do it in the past few days, and he is currently short of various building materials.

There is enough sand.

There is a shortage of cement and steel bars.

therefore.

Next step: Heap capacity!

Strive for the dam to be completed within a month.

You heard that right.

a month.

I didn't dare to think about it before, but now Shu Fu has confidence.

Moreover, the rainy season on Alien Star is coming, repairing this dam can reduce or even eliminate flooding.

. . .

a day later.

East Island.

north.

Ten kilometers away from a very large limestone mine.

at this time.

The construction machinery is busy, and its main job is to do one thing, that is, to lay the foundation, drill holes, place the reinforcement cage, and then pour.

Under mechanization, the speed is fast.

suddenly.

There was a rumbling sound from the sky.

Feiyu came to the top of a solidified foundation cap.

next second.

Various factory buildings appeared on the originally empty caps, all of which were steel structures. If you look closely, you can see that the main connections are all bolts.

The current source has met Shu Fu's expectations a week ago.

Collect parts.

Assembled internally.

Then let it out.

then.

A cement plant landed in minutes.

This speed is no longer at the level of a madman, but has reached a new level.

However, although landing.

But if you want to produce, you have to wait a few days. This is a new mine, and the power grid has not been pulled in yet, and some mining equipment is still in production.

With the first seat.

second seat.

third seat.



fifth seat.



tenth seat.

Around this huge limestone mine, ten new cement plants have been added in just three days, and the lines of the nuclear power plant have also been erected.

that day.

All started.

Boom~

Boom~

Boom~

The entire mine, the upper floor was directly plowed, and millions of tons of ore fell off. Shu Fu directly helped to carry them to the cement factories not far away.

Get materials nearby!

As for the required coal, millions of tons were blasted from an open-pit super coal mine on another continent in the same way, which is enough for a cement plant for a long time.

at this time.

Looking at the smoking cement factories, Shu Fu was a little hard to adapt.

Science and technology are primary productive forces.

Plug-in, at least the second productivity.

The change in productivity is really fast.

but.

It seems very good.

Otherwise, in terms of natural stacking capacity, it was planned before that to complete the comprehensive infrastructure construction of the mainland, it would take ten years, or even twenty years.

More than 21 million square kilometers of land is not fake.

At that time, I was... going to five!

Scared!

so.

At this speed, Shu Fu likes it very much!

Heap capacity.

The purpose is not to build a dam, but to pile up the potential. When it can't be used, you have to wait. In addition to these cement plants, the same is true for steel plants.

Some new ones have been added in the past few days.

It's not over yet.

The expansion of raw material industries will not be stopped until the end of the month, and after that, operations will be maintained.

At that time, I will be much more relaxed.

. . .

June twenty-fifth.

early morning.

Shu Fu came to the valley again. At this time, the bottom of the dam had been dug into the rock layer, but the hardness was not enough, and equipment was breaking the surface rock layer.

According to the results of geological exploration, it is enough to dig one meter down.

therefore.

Been working on this for days.

After arriving, Shu Fu took away all the gravel, and the hard rock below could be seen.

"let's start!"

"yes!"

Ten large drilling machines started to work. Although the rock is hard, the drill bits are more powerful. In less than an hour, a pile foundation hole was drilled out.

One meter eight in diameter.

Depth twenty-five.

subsequently.

Change places and continue drilling.

On the short section, there are ten such foundation piles, and on the long section, there are one every fifteen meters, and a total of more than 1,500 piles will be laid in the whole.

truth.

Exceeded.

The redundancy is extremely high, and a thousand of them are enough.

But think about it, adding 500 more sticks is safer, and it won't increase the cost much anyway.

The materials are here with Shu Fu, so they hardly need to be counted as money.

Come to the drill hole.

Looking down, you can still see the bottom through the light, and then, while waiting to drill the hole, the steel cage that has been tied in the source is directly put in.

next second.

Wow!

The mixed concrete fell from the sky, and a cast-in-place pile was poured just like that.



We are really good at construction sites!