Chapter 1501

When saying this, Zhuang Jianye was not only modest, but also helpless. By the way, there was a bit of shyness in it.

The implication seems to say that I can't help it. I came out to make a living. As a result... I was very flustered, but I didn't have any way. I didn't have a 20 MW industrial gas turbine in my hand. Leaders of the west to east gas transmission project team, do you think this 30 MW high-power gas turbine is OK?

Shen and aojinlaike and other friends and businessmen were surprised and angry.

Of course, it is amazing that the d-71m gas turbine has reached the level of 30 MW super power gas turbine.

As a result, d-71m gas turbine is no longer a simple competitor to gas turbines including da-80t and ge-2800. Instead, it directly presses the heads of several friends and puts them into the toilet. When they drown, when they are pulled.

No way, it's completely structural rolling, so that there's no spare force to fight back.

With a total weight of 27 tons, excellent versatility and overall transportation capacity, plus 30 MW power, China's d-71m gas turbine has reached the world's top level in terms of indicators.

Among the same level, only GM's latest lm2500-g4 gas turbine and the mt30 gas turbine in RORO, UK can compete with it.

The rest is counted as one. They are all rubbish that can't be put on the table.

As for anger, needless to say, it depends on Zhuang Jianye's poor and innocent disgusting appearance. The friends and businessmen present are not angry. Is this showing off or attacking them?

Accidentally, you just got a 30 MW gas turbine?

If you take it seriously, you can catch 40 MW and 50 MW!

From here to there, Zhuang Jianye is not just insinuating that these friends and businessmen are nothing. They can't even compare with the temporary goods they accidentally get. What's the face to stay here and compete with them for the gas turbine project of the second phase of the west to east gas transmission project!

In particular, President Shen, as the biggest competitor of China's take-off, knows very well that more than 80% of these meanings point to their aviation development head office.

Don't think that if you take the lead in high-power gas turbines, you will really be proud of the whole domestic gas turbine Jianghu.

That's why we didn't take China off seriously. That's why Zhuang Jianye didn't treat you as a onion.

In that case, just be a man with your tail between your legs and make some money secretly. As a result, you have to be a demon. Well, it attracted the attention of Zhuang. Then China took off and threw out the d-71m gas turbine, which directly crushed president Shen's fancy operations for so many years.

No way, in front of the real hard core strength, all operations are floating clouds.

President Shen certainly knows this truth. The problem is that they don't have their own hard core technology. All gas turbine related technologies are purchased from abroad. They don't have their own technology accumulation and R & D investment. They look brilliant. In fact, they are like castles in the air. Everything is fine without puncturing. Once there is an air leak, they can't be saved if they want to save it.

For now, even if the d-71m gas turbine is placed in front of President Shen and asked the Aviation Development Corporation to copy and copy, they all have black eyes and don't understand what to do inside.

On the contrary, if you casually open the products of Ge and Siemens and show them to the engineers taking off in China, you can get a fat boy at once. The probability of pregnancy at a glance is at least more than 95%.

No way. For more than 20 years, China's industrial gas turbines have been driven out step by step through its own aeroengines. During this period, it has accumulated a lot of experience, trained a large number of talent teams, and created a large number of unique processes and technologies.

These things can't be bought for tens of billions of dollars.

This is also the core of China Tengfei's courage to take its newly finalized gas turbine here at this moment. I have the ability to make you catch up and fight against it!

Others dare not say that President Shen has no courage even if he wants to fight. There is no way. The gap between their da-80t and others' d-71m gas turbine is not generally large.

It is even the product of two generations, not to mention the Aviation Development Corporation without core technology. Even the original Russian Aviation Power Corporation may not have this ability!

Because of this, President Shen's old face is not only ugly, but also very depressed!

Of course, o'jin Lake standing next to President Shen is not much better. An old face is like a cooked crab, and the red one can't hang up.

No way. He just vowed that the weight of gas turbine per kilogram is useful. As a result, this word is still ringing in people's ears. China's soaring d-71m gas turbine comes up with a super power of 30 MW.

I thought it was a sick weak chicken, but I didn't expect it to be a powerful king with muscles in his bones.

This makes oginlike, who often holds ge-2800 gas turbine and talks about leading technology and thermal efficiency in the world, feel ashamed.

But there is no way to refute it. You should know that the figures on the gas turbine operation control panel can be fake, but the pressure in the test pipeline of the west to east gas transmission project team is impossible.

We should know that the transportation of energy pipeline is to realize the rapid flow of oil and gas by constantly inputting high pressure, so the force pressure in the pipeline is usually very large,

In terms of the design index of the second phase of the west to east gas transmission project, the average pipeline pressure should reach 10 MPa, and even 30 MPa in special sections.

At this time, the d-71m gas turbine with a power of 30 MW gave an amazing 45 MPa to the 60 km long oil and gas test pipeline.

Thanks to the design pressure of this test pipeline reaching 60 MPa, otherwise the pipe would have burst according to the 40 MPa specification of general pipeline.

But just because of this, the leaders of the west to east gas transmission project team are happy and are about to faint.

The high power of d-71m gas turbine means that the pressure applied to the pipeline is large, which can promote the transmission of oil and gas for a longer distance.

As a result, the original 74 booster valve stations are redundant, which can be reduced by at least more than a quarter.

We should know that the construction of a booster valve station with equipment can't go down without 200 or 300 million. The budget of some complex sections is more than 500 million, which is the largest expenditure item of the whole pipeline project.

Cutting off one quarter at a time will save more than hundreds of millions. Billions or even tens of billions are possible.

In that case, those who can help the project team save money are their own babies. They want to give it directly.

The same is true for the executive deputy group leader, but he has another important task, so he can't help asking Zhuang Jianye: "what is the maximum stable output power of your d-71m gas turbine?"

"35 MW!" Zhuang Jianye answered cleanly.

"35... MW!" the executive deputy group leader was really surprised: "it's nothing to promote 10000 ton drive..."

"Leader, where is this?" Zhuang Jianye waved calmly again: "ten thousand tons of large drive is too much to see. In fact, it is not difficult for four units to drive a 60000 ton aircraft carrier in parallel!"